Front entrance steps,
designed before construction begins.

524 Stream Crescent, Toronto, OntarioPrepared today

Private proposal

Prepared exclusively for this project.

Prepared for Seema at 524 Stream Crescent. Two design options are presented for the front entrance steps, each with a clear investment — Option 1 at $3,000, Option 2 at $2,500.

Taishan Construction gold mountain mark
TAISHANDesign-First Exterior Transformation
Proposal statusDesign Review
Prepared forSeema
Prepared byTaishan Construction
Site address524 Stream Crescent, Toronto, Ontario
Reference3D Visualization Package
Design options2 — Rebuilt Steps & Pad / Steps Only
ScopeFront entrance steps
InvestmentOption 1 $3,000 · Option 2 $2,500
Estimated durationTo be confirmed
Last checkedChecking secure access…
Proposal IDTS-2026-STREAM-524
VersionV1 — Design Review

3D visualization

See it before you build it.

Two design options for the front entrance steps, each shown from two angles — visualized before construction begins.

Project approach

How Taishan Construction delivers this scope.

A disciplined sequence from preparation to turnover, coordinated with you.

01

See it before you build it

Your front entrance steps visualized in 3D across two design options before construction begins at 524 Stream Crescent.

02

Built properly beneath the surface

Proper demolition, excavation, subgrade inspection and compacted base preparation beneath the new steps.

03

Clear scope, clean execution

Two simple options — rebuild the steps, or replace the steps only. You choose the approach that fits your home.

04

Inspected and turned over

Step stability, transitions and finished edges inspected, deficiencies corrected and a final walkthrough completed with you.

Design options

Choose your entrance option.

Two approaches are available for the front entrance steps at 524 Stream Crescent. Select the option that fits your home.

Complete demolition of the existing concrete steps, followed by excavation, base preparation and construction of new steps and a new interlocking pad, as shown in the Option 1 renders.

  • Demolition and removal of the existing concrete steps
  • Excavation and subgrade preparation
  • Compacted aggregate base in controlled lifts
  • Construction of new rebuilt steps
  • New interlocking pad installation
  • Drainage consideration and grading at the entrance
  • Final cleaning and walkthrough

Investment summary

$3,000

Two clear options for your front entrance steps at 524 Stream Crescent. Option 1 — Rebuilt Steps & Pad is $3,000. Option 2 — Steps Only is $2,500. Select the option above to see its investment and scope.

Selecting an option records your preference so Jeff can prepare the matching quote — nothing is sent to you without his approval.

Selected optionOption 1 — Rebuilt Steps & Pad$3,000 · CAD
Demolition and removal of the existing concrete stepsExcavation and subgrade preparationCompacted aggregate base in controlled liftsConstruction of new rebuilt stepsNew interlocking pad installationDrainage consideration and grading at the entranceFinal cleaning and walkthrough

Construction sequence

A clear path from preparation to turnover.

Sequence and duration to be confirmed with Jeff based on your selected option and site conditions.

DAY01

Mobilization and Preparation

Site setup and protection of the home, garage and adjacent property.

DAY02

Demolition or Step Removal

Option 1: demolition and removal of the existing concrete steps. Option 2: removal of the existing step treads and risers only, keeping the existing concrete section at the bottom.

DAY03

Base Preparation

Excavation, subgrade inspection and compacted aggregate base beneath the new steps.

DAY04

Step & Pad Construction

Construction of the new steps and, for Option 1, the new interlocking pad, with clean transitions.

DAY05

Finishing and Turnover

Drainage check, final cleaning and a walkthrough with you.

Review and confirmation

Scope review
with you

Please review the two design options above and confirm which approach you prefer for the front entrance at 524 Stream Crescent. Jeff will follow up with next steps.

Note: Option 1 — Rebuilt Steps & Pad is $3,000. Option 2 — Steps Only is $2,500. Confirming your preferred option records it for Jeff to prepare the matching quote.

Questions? Contact Jeff directly.
ProjectFront entrance steps
Design options2 — Rebuilt Steps & Pad / Steps Only
Renders included4 visualizations across 2 options
Reference3D Visualization Package
Estimated durationTo be confirmed
Selected design optionOption 1 — Rebuilt Steps & Pad
Investment$3,000